Showing posts with label Turnditch. Show all posts
Showing posts with label Turnditch. Show all posts

Tuesday 27 October 2020

Russets missing

 In these days of Covid-19 we are keeping close to home to avoid the risk of infection. We've not put a lot of work into the orchard, but we have been keeping an eye on it. The grass has been allowed to grow long, but the fruit trees are sufficiently mature that it does not greatly affect them.

A couple of weeks ago we had a good crop of Russet apples on the Egremont tree. I don't normally pick them until late October/Early November as they are a late apple and the delay enhances their flavour. Today (27th October ) I decided to harvest the crop. However on arrival, I found not a single apple on the tree and none on the ground below.

It looks like we've had the crop stolen.

It takes quite a lot of work to maintain the orchard, and it is very disappointing to not reap the benefits. In my current frame of mind I'm tempted to apply for planning permission on the site, which is outside of greenbelt, with good road access. I know the authorities are looking for locations to provide and fund social housing for migrants. There's a handy bus route nearby and all of the necessary utility services are available. It would certainly give us a healthy profit while also being a benefit to society.

Friday 13 May 2016

Crime in sleepy Turnditch

Crime visits the sleepy village of Turnditch, or rather the orchard site we're developing. We'd installed an electric fence between our site and the adjoining farmer's field The purpose was to stop sheep coming into the orchard and destroying the young fruit trees. This electric fence also had the side benefit in that stopped the farmer's sheep wandering on to the Ecclesbourne Valley railway. Those sheep are not our responsibility, but it cost nothing to have extended the protection, so it was a courtesy.

This evening we visited the site to charge the battery which powers the fence. When we arrived we found that someone has stolen the fence energiser unit. We'd hidden this unit out of sight under a builder's bucket, but anyone following the fence line would be able to find it. It was positioned in such a way that a deliberate premeditated activity is needed to locate the unit. 

It is a red coloured Hotshock A15 energiser worth £137. and was equipped with an iron stand post.

Ironically the thief left the lead acid battery in place. It was worth more than the energiser, but weighing in at 20 Kgs was less attractive. This crime will be reported to the police so will be included in the official figures for the locality.

There was also damage to the street side stock fence where someone has cut through the wire stock fence to gain access to the orchard. It is quite a distance from where the energiser was located, but this criminal damage is probably related to the theft. This will be reported as a crime. The combination of the two activities means it is possible for the sheep to gain access to the road. 

Criminal activity as thieves cut through fence in Turnditch Orchard
Hole cut in roadside stock fence


By the way, the unit is forensically marked. Should anyone be daft enough to buy it they'll find out the hard way such things are traceable.

Saturday 25 July 2015

Removing sick Elm trees

We cleared out some sick Elm trees from the river bank this week. It is all part of the programme to open up the river bank down at the Turnditch Orchard Project. We used cable winches to prevent the trees falling into the river and a chain saw to cut the trees. I made good use of my new wader boots as the dummy in the water. 


It is a lot more open than it used to be when we first took possession of the field. There's a couple of pictures below showing the before state.

The river bank before cut back. Notice the marked trees.

Our dog getting ready for a paddle.


There is of course a very large pile of wood now awaiting destruction by burning on site. We don't want to risk spreading the disease any further. I'll devise some kind of furnace to keep the fire temperatures high. Elm is usually not a very good firewood, if left to its own devices it usually produces a lot of acrid smoke when it burns in an open fire.

This tree removal work will make space for us to introduce some erosion control on the river banks.

Saturday 13 June 2015

Himalayan Balsam at Turnditch Orchard

The River Ecclesbourne which runs along the foot of our orchard is a conduit for the seeds of the Himalayan Balsam (HB). This is an invasive weed which needs to be controlled. Over the  past couple of years we've been removing any HB we've found growing on the land. It is under control now. You have to be very ruthless about its removal before it has the chance to go to seed. The seed pods pop and explosively scatter seed over quite a distance when they are ripe.

However the adjoining field and the river upstream of our site are full of this resilient weed and provide a source of new "infections" of HB. I noticed some growing in the silt at the edge of our river a few days ago, so I donned some waders to deal with the weed. It is fairly easy to uproot the  weed roots and all by gently pulling on the stem. If you leave any broken off weed stems they soon regrow.

Here's a picture of before and after:

Himalayan Balsam at the Turnditch Orchard

Himalayan Balsam removed from river bank
Note I removed the pile of weeds shown in the lower photo, they'll be incinerated. There's useful leaflet about controlling the weed from the Derbyshire Wildlife Trust here.





Wednesday 22 October 2014

Electric fence progress

I spent a few hours in the orchard today to complete the main part of the installation of the electric fence. There's now five stands of fence wire installed and correctly tensioned mounted on suitable insulators. In total there is over half a kilometre of  wiring, 60 insulators  and 25 wire knot joints. Feeding the high tensile wire was really hard work because I didn't have the correct "bobbin" to roll out the wire. Instead I had to work from the coil of wire. The coil was constantly threatening to explode into a birds nest of wire tangle. I had to feed each inch of wire carefully whilst keeping a tight grasp on the main wire coil.

The Gripple line tensioning tool (Torq) worked superbly and made the job of tensioning the wire really straight forward. Tomorrow I'll be ordering the lead/acid  batteries to power the fence.
Five strand Electric fence at Turnditch Orchard
Electric fence at Turnditch Orchard


Edit 25/10/2014

The electric fence is connected and live as of 5 pm today. The connection process was straightforward as a consequence of the careful planning work and preparatory effort. The "hot" wire strands are interconnected at various points along the length to ensure maximum connectivity and to minimise any power leakage, The measured voltage on all strands is 7000 volts. The bottom strand will not normally be connected to the power, but will be configured as a ground wire.

Edit 15/01/2015
We were beginning to wonder if we'd wasted money and effort on the electric fence. However when we drove past the site today and noticed the sheep were back in the adjoining farmer's field. The fence seems to be keeping the sheep out of our orchard. Yippee!

Monday 11 August 2014

Important Hedge in Turnditch Orchard.

It turns out the hedge we had re-laid is an "Important Hedgerow" under the terms of the  Hedgerows Regulations 1997 which were made under Section 97 of the Environment Act 1995 and came into operation in England and Wales on 1 June 1997. The hedge forms the boundary between our orchard and the farmer's fields to the south. As such it is protected from removal and destruction. 


The reason why it is classified as Important is it marks the boundary between two parishes prior to 1850, it being on the parish boundary between Turnditch parish and the Shotlle and Postern parish.


The hedge at the river end of the field is also under the same category because the public footpath runs closely parallel. Under the regulations having a footpath or bridleway close to the hedge makes it classified as Important and thus protected.


The trees in the woodland on the embankment adjoining the orchard are regulated under the Forestry Act 1967 which imposes limits on which trees can be felled. They control the amount of timber which can be felled (up to 5 Cu M per calendar quarter) and allow some exemptions for pruning, thinning, pollarding and coppicing. The plans we have for tidying and maintaining the woodland will fall within the exemptions. We are planning gradual coppicing spread over three years. It does does however mean we'd have to apply for a felling licence if we were to need to fell the large old Ash tree on the south hedge.

Monday 28 July 2014

Investigating the river

We spent Sunday morning at the orchard site. I'd been intending for some time to get my wellington boots on and go along the river during the low summer water levels. As long as I avoided the obvious deeper areas I was okay and didn't get boots full of water. The banks are about 2.5 metres above the riverbed and quite steep, I pre-fixed a knotted rope to a tree so I'd be able to climb out again. 

One side of the orchard is a road embankment which leads to a railway bridge from the river. The road was built across the floodplain when the railway was first built, so quite a substantial amount of landfill was used to create the "hill" leading to the bridge. The bottom section of our field which forms the river bank has also had some build up of fill to allow access to the  road. It looks like the fill material was quarry chippings. Over the past 150 years this has been overgrown and no longer looks artificial. However when the river runs in full spate in the winter rains it fills almost to the top of our river banks. The river is a very different beast from the gentle brook of the summer months. The flooding causes erosion of the material dumped to form the ramp up to the road. 

Riverbank washout
Wash-out of the river bank

The washed out materiel is then dumped on the river bed. You can see the results of this in the above picture. The rubble is limestone chippings and appears to have built up above the normal level of the river bed. The picture below shows the roots of elm trees which have been exposed by the erosion of the bank during periods of river spate/flood.


Erosion of tree roots River Ecclesbourne
Eroded tree roots on the river bank

We'll be removing these compromised trees in the autumn and as mentioned in an earlier blog replacing them with  live willow spiling to control the erosion of the river bank. During this inspection process I was assisted by two young apprentices. They  seemed to be intent on making much splashing in the river.

Apprentice river bank surveyors

We also managed some weed clearance, particularly the Himalayan Balsam  which is an unwanted invasive species. This is going to be an on-going battle because the weed is is rampant upstream and down stream of our site. We can at least prevent the seeds being formed on our land. There are some legal responsibilities in dealing with this weed.

Himalayan Balsam on the river bank





Saturday 14 June 2014

More wildflowers

We were at the orchard site yesterday to install some posts around the fruit trees. To our delight we found some Common Spotted Orchid growing where we'd cut the grass. It's good to see some wild flower there.

Monday 3 February 2014

Riparian owners in an orchard.

We did some research on the responsibilities and rights we gained when we took on the plot of land at the edge of the Ecclesbourne River. Officially at the place of our orchard it is a watercourse and not a river. The following is a summary and not necessarily correct legal advice on our part.

Riparian Owners 
You are known as a riparian owner if you own land or property adjacent to a watercourse. By virtue of being a riparian owner you have rights and responsibilities.

Your rights as a riparian owner are

  • You are presumed to own the land up to the centre of the watercourse, unless it is known to be owned by others.
  • You have the right to receive flow of water in its natural state, without undue interference in quantity or quality.
  • You have the right to protect your property from flooding, and your land from erosion. You will in most cases need the prior consent of the Environment Agency and Local Authority for any works, however. In the case of The Ecclesbourne at Turnditch it is Derbyshire County Council.
  • You have the right to fish in your watercourse, although this must be by legal methods and with an Environment Agency rod licence.
  • Without needing a licence, you can abstract a maximum of 20 cubic metres of  water per day for the domestic purposes of your own household or for agricultural use, excluding spray irrigation, from a watercourse at a point that directly adjoins your land. Most other types of abstraction will require a licence from the Agency. 

Your responsibilities 

  • You have the responsibility to pass on flow without obstruction, pollution or diversion affecting the rights of others. 
  • You have the responsibility to accept flood flows through your land, even if caused by inadequate capacity downstream, as there is no common law duty to improve a watercourse.
  • You are responsible for maintaining the bed and banks of the watercourse (including trees and shrubs growing on the banks), and for clearing any debris, natural or otherwise, including litter and animal carcasses, even if it did not originate from your land. 
  • You must not cause any obstructions to the free passage of fish. 
  • You are responsible for keeping the bed and banks clear of any matter that could cause an obstruction, either on your land or by being washed away by high flow to obstruct a structure downstream. Watercourses and their banks must not be used for the disposal of any form of garden or other waste. 
  • You are responsible for keeping clear any structures that you own such as culverts, trash screens, weirs and mill gates. 
  • You may have flood defences such as walls and embankments on your property, which are vital for the protection of both yourself and others. You should discuss the maintenance of such defences with the Environment Agency office. 
  • You are responsible for protecting your property from seepage through natural or man-made banks. Where such seepage threatens the structural integrity of a flood defence, it may become the concern of the Environment Agency. 

Saturday 5 October 2013

Planning the Ashbourne Road orchard plot fence

We've reviewed the roadside hedge on the Orchard project. 

The approach road to the railway bridge creates an embankment leading from the River Ecclesbourne to the crest of the road bridge. 

To improve the natural environment, we're going to coppice the trees growing on the south side of the embankment. The tree canopy blocks out the light and reduces the variety of species growing on the south facing embankment. The existing trees appear not to have been managed for many years. Some of the taller trees overhang the road and railway. When we fell the trees to create the coppice stools we'll have to proceed carefully. We'll use wire cables and winches to ensure the tree fall where we want them to go.  We'll probably have to take out most of the trees progressively along the embankment working from the river end toward the railway. This is necessary to create the safe felling space for the larger trees. Within a couple of years though there will be substantial regrowth from the coppice stools, but in the meantime other natural species will have the opportunity to recolonise the embankment.

The roadside hedge needs a lot more attention before we'll have it fully restored. There are gaps from deadwood and also from damage caused by a road accident. We need to make the hedge stock proof, so we are planning to install a 90cm high galvanised wire stock fence along the roadside boundary extending from the river gate to the end of the rail bridge parapet. We measured this and discovered we'll need to install 108 metres of wire stock fencing. The need for the fence is improve public safety and to reduce the chance of livestock escaping on to the road. There is a fence lower down at the foot of the embankment slope, but we'll need, temporarily, to dismantle the fence during the coppicing process.

Once the fence is secure, we'll gradually work on restoring the hedge using traditional layering and replanting at the top of the embankment slope as necessary. Our estimate is it will take about three years before it starts looking like a reasonable countryside style hedge. We'll plant a variety of hedgerow saplings in increase disease resistance and also to provide better variety. Once the hedge is properly re-established we'll remove the wire fencing.

Wednesday 25 September 2013

Wild Plum (Bullace) jelly from the Turnditch orchard

Bullace

We cooked the Bullace mentioned earlier to make a delicious jelly.  It will also go well with the turkey at Christmas. It is quite fragrant,  apparently this year has been a vintage for wild fruit.  We also made some "Sloe Gin" with a proportion of the wild plums (Bullace), this will no doubt be a welcome sight on the sideboard during Christmas evenings as the guests arrive.



Monday 23 September 2013

Plans for use of the land at the Turnditch Orchard Project.

We've been asked what we are planning on the Turnditch Orchard Project.

The long thin rectangle shape of the land is not good for agricultural machinery techniques. It would be great for property development, but we've absolutely no intention of following that route. The land will remain agricultural and we intend to take a regular harvest from the land.




Present conditions

The site appears to have been neglected for many years. The level part is overgrown with uncut grass, extensive thistles and Alder shrubs. Many ants nests have made the ground very uneven. The road embankment, which forms part of the property is covered with unmanaged native tree, mostly English Ash and some Hawthorn. The hedges are unmaintained and ineffective. some of the trees tower over the Ashbourne Road (A517). Many of the fences are in poor condition and the stone posts to the entrance gate are damaged.

Planned actions
  • Clear the grass and weeds with a scrub cutter;
  • Create natural compost area
  • Repair the gate posts and gates;
  • Make the access secure;
  • Create a temporary tool store;
  • Take advice on the large old Ash tree;
  • Clean out the undergrowth and unwanted trees in embankment area;
  • Cut the chosen trees for coppicing;
  • Trim trees overhanging the road;
  • Restore the hedges;
  • Cut the wood into logs and store for seasoning
  • Turn unwanted wood into chips;
  • Turnover the level ground soil with Rotavator & check drainage;
  • Plant meadow seed, herbs and crops;
  • Restore fences;
  • Set up bee hives;
  • Create safe access to the river.
  • Select orchard trees for planting.
When these action are largely complete we'll discuss providing access to local villagers. The intention of coppicing is to provide greater nature diversity on the embankment and also provide a wood crop in the future years. It will look a little stark initially, but will provide some great benefits.


Friday 20 September 2013

The seeds of a plan to create an orchard in Turnditch.

Welcome to the Turnditch Orchard Project. Turnditch is a small village in Derbyshire

We recently saw a small plot of agricultural land on the eastern outskirts of Turnditch village for sale by auction. It adjoins the Ecclesbourne River at one end and the north side has the Ashbourne Road (A517) as a boundary. At the east end the boundary is the Ecclesbourne Valley Railway. The land is about 0.8 acres (0.3 Hectares) in area. A footpath crosses the westerly end of the plot next to the river.

We've recently moved to Belper as semi-retirement from busy careers in London. When we saw the land we thought it would be a ideal plot where we could create an orchard. On inspection the land was found to be overgrown and shows years of neglect.

Site of the Turnditch Orchard Project

We made a bid at the auction and won the plot. After the usual legal palaver and a handover of a cheque the land is now ours. Now the hard work starts to clear the land and begin the process of creating an orchard. 

This blog will be a record of the progress. We've no intention of developing the land other than the orchard and will be looking at ways to provide access to the local primary school.