Showing posts with label erosion. Show all posts
Showing posts with label erosion. Show all posts

Sunday 10 January 2016

Willow harvest at the Orchard

We harvested last year's growth of willow from the grove planted in the Turnditch Orchard. We planted the willow (100 wands) in 2013 shortly after purchasing the land to form the orchard. This year was the first time we've taken a crop.



We were able to take about a wheelbarrow load of willow branches or wands from the plants. We've coppiced them to waist height to encourage the development of a trunk with thicker tough bark and provide future resilience from rabbit or sheep attack.

The field is quite soggy at the moment following all the rain we have had recently, The base of the willow was under water in a large puddle. Fortunately willow is able to resist such wet conditions without damage. Over the past few weeks the river has come close to the flood levels on several occasions, but fortunately the rain lessened and we were not flooded.

We were able to use the willow (Salix Verminalis) to start work on spiling the river bank. We were able to create a trial three metre section. We'll monitor progress during the year. If it regrows well we will repeat the process next winter.



The willow spiling is formed by pushing the thicker sticks into the ground (after using an iron bar to make a hole) in an upright position. The remaining thinner willow sticks (whips) are woven horizontally between the uprights to form a low wall. We also planted the butt end of most of the sticks in the soil. Most of the willow will take root and grow during the spring/summer forming a living green wall. The willow roots will penetrate down into the river bank in search of nutrients and water. The mass of willow roots will reinforce the river bank and protect against further erosion. The wall will collect sediment behind it during flooding and is not damaged by inundation. As the willow becomes established we'll have to periodically trim it back to stop it growing too tall.

Saturday 7 March 2015

Clearing the river bank

I was able to put some time and effort into clearing unwanted trees from the river bank at the Turnditch orchard. The purpose of the clearance is to give some light for willow. We intend to plant the willow as woven spiling to protect the river bank from further erosion. This part of the River Ecclesbourne is prone to scour after the bridges in the fast flowing winter spate. 

We are initially removing some large hawthorn bushes which are overgrown, tangled and threatening to fall over into the river. We cannot simply fell the bushes as the weight of the top growth would cause them to topple into the river and make recovery much more difficult. Even directional felling cuts would not guarantee a safe or convenient fall of the bush. These bushes are about 20 ft (6 metres) tall and probably weigh about one tonne. They each have several upright trunks clustered around a root.

To achieve safe removal we're using cable winches to apply tension from the best direction. Once the trunk is under tension using a chainsaw we apply a partial felling cut, but not enough to fell that section of the bush. We then retire to the winch and increase the tension until the trunk disentangles from the top growth and falls. Using the winch we pull that section of the bush to a safe place where we can cut off branches then cut up the trunk. We are using an indirect pull from a cable winch and steel wire. The direction of the pull is set up using a snatch block pulley anchored to a convenient place.

We are delivering a coppice type cut to the hawthorn. It should allow them to regrow, but this time the process will be managed!



View of indirect winch set up.
Indirect winch arrangement

The snatch block anchored to old gate post:
Snatch black anchoring
The cable winch:
Cable winch anchored to ash tree
Applying tension to the bush:
Apply tension prior to cutting

The next step will be to remove half a dozen small Elm trees on the river bank. I noticed last year there were badly wilting which suggests they have Dutch Elm Disease. We'll burn the wood on site to prevent any further spread of this tree disease.



Monday 28 July 2014

Investigating the river

We spent Sunday morning at the orchard site. I'd been intending for some time to get my wellington boots on and go along the river during the low summer water levels. As long as I avoided the obvious deeper areas I was okay and didn't get boots full of water. The banks are about 2.5 metres above the riverbed and quite steep, I pre-fixed a knotted rope to a tree so I'd be able to climb out again. 

One side of the orchard is a road embankment which leads to a railway bridge from the river. The road was built across the floodplain when the railway was first built, so quite a substantial amount of landfill was used to create the "hill" leading to the bridge. The bottom section of our field which forms the river bank has also had some build up of fill to allow access to the  road. It looks like the fill material was quarry chippings. Over the past 150 years this has been overgrown and no longer looks artificial. However when the river runs in full spate in the winter rains it fills almost to the top of our river banks. The river is a very different beast from the gentle brook of the summer months. The flooding causes erosion of the material dumped to form the ramp up to the road. 

Riverbank washout
Wash-out of the river bank

The washed out materiel is then dumped on the river bed. You can see the results of this in the above picture. The rubble is limestone chippings and appears to have built up above the normal level of the river bed. The picture below shows the roots of elm trees which have been exposed by the erosion of the bank during periods of river spate/flood.


Erosion of tree roots River Ecclesbourne
Eroded tree roots on the river bank

We'll be removing these compromised trees in the autumn and as mentioned in an earlier blog replacing them with  live willow spiling to control the erosion of the river bank. During this inspection process I was assisted by two young apprentices. They  seemed to be intent on making much splashing in the river.

Apprentice river bank surveyors

We also managed some weed clearance, particularly the Himalayan Balsam  which is an unwanted invasive species. This is going to be an on-going battle because the weed is is rampant upstream and down stream of our site. We can at least prevent the seeds being formed on our land. There are some legal responsibilities in dealing with this weed.

Himalayan Balsam on the river bank





Saturday 19 July 2014

Elm trees diseased and need removal

It is clear on in inspection some of the small elm trees near the river have become diseased and should be removed. This summer they suffered sudden and severe leaf wilt.  I've marked the affected ones with arborist spray paint (blue) and as soon as the bird nesting season is over we'll be in with the chain saw, winches and ropes to remove the affected trees. They are clustered around the river end of the field.


Diseased and wilted Elm leaves in Turnditch orchard
Wilted Elm leaves at the Orchard

We'll dispose of the diseased wood on site in large bonfires. This will avoid spreading the infection elsewhere. It is a pity to destroy elm trees which are no longer a common species, but if they are infected there is no option.

I saw some trout in the river Ecclesbourne while I was checking the trees. The water level is at the summer lows at present, so in places it is only a few inches deep, but the fish seem happy enough. They looked like brown trout. Part of the river bed is now above water. It looks like crushed stone debris. Possibly the debris is the result of the river bank erosion caused during the winter flooding. It demonstrates the need to undertake some bank reinforcement works with live willow spiling.

Tuesday 22 October 2013

Will the site flood?

We did a brief site visit to assess the impact of the past few days of heavy rain. The River Ecclesbourne is now running fast and a lot deeper than its normal state.


However the river would need to rise about another metre before any flooding takes place, so at the moment no major worries.

Note 1/11/2013:
I have made a note later in the blog about river bank erosion. You can just see some of this erosion where the Elm sapling grows in the above picture. The bank are about 2 metres and pretty much vertical above the river bed. During the summer the edge of the river is only 5 cms deep so the spate condition must be at least a metre deep and fairly fast flowing. The opposite bank has some stonework and steps to provide access and some protection against erosion. The general state of neglect by the previous owner(s) of the field and river bank will need some remedial work to prevent further damage.