Monday, 28 March 2016

Floods at the Turnditch Orchard project

We called in at the orchard site  this morning. The Ecclesbourne River has overflowed its banks and some of the land of the orchard has been flooded. Storm Katie dropped a lot of rain last night and the river level flashed up by 150cms. As a consequence some of the fruit trees have their "feet" in water. Flooding can kill the trees, we'll have to wait and see how they survive.  

Longer term it may be worth opening up the old drainage ditch which runs across the orchard. It is fed by the culvert which was built when the embankment for the railway bridge was formed. Previous owners of the land have filled in the ditch, which was present on maps prior to 1850. Perhaps an opportunity for the volunteer work force to drive a small back-hoe excavator one day!

Tuesday, 1 March 2016

Smoke in the eyes

We had a very successful bonfire on the Orchard at the weekend. The volunteer team did a great job in getting rid of much of last year's blackthorn brash left over from the land clearance work. 

The careful techniques of fire lighting espoused by Ray Mears were avoided. We've found the most effective method is chop up a wooden pallet, add rubber carpet underlay or plastic bags then install this in the heart of the pile before lighting. Once the fire takes hold just about any branch will be quickly consumed. 

Edit: 06/03/2016

We had a similar bonfire session this weekend (a week later).  it's bit like a solid three hour work-out in the fitness gym with much bending, lifting, pulling and walking between the piles of branches and the bonfire. 

The activity was blessed with a visit from the Committee who wanted to meet the management and the volunteers. The Management welcomed the Committee and told them it was impossible to value the work of the volunteers too highly. The new rules were unanimously agreed by those present, including a new uniform for the volunteers. Bullace Gin refreshments were served to all.

Monday, 15 February 2016

The return of the sheep.

It was a busy week in the Orchard at Turnditch. Sheep have been allowed into the adjacent field to graze. Unfortunately they do seem attracted to the lush green grass in the orchard. They had found a way through the old broken fences of the plot at the thin end of the orchard. We'd prepared for this with an additional temporary wire stock fence across the untamed part of the orchard. However the sheep found a way via the Ecclesbourne railway track to access the woodland embankment. While it is the farmer's responsibility under common law to enclose his sheep to prevent them damaging other property, we had to take action to protect the embankment.

Fortunately we had a spare set of electric fence equipment, tape and posts, so we were able to create an additional barrier  of electrified tape at the railway end of the orchard and up the embankment. So far it has been wholly successful at repelling the woolly invaders. Meanwhile we have been removing the year's overgrown vegetation from the old electric fence using a powered brush cutter. The old fence will be re-energised tomorrow once the warning notices are replaced.

Some sheep remain on the verges of the railway. We've phoned both the farmer and the railway management to warn them of this situation.

Speaking of invaders on the orchard we discovered that people have been cutting back some branches on the far end of the orchard embankment. We presume it is volunteers from the Ecclesbourne Railway making an unauthorised path through our land. Let's hope they don't try to climb the new electric fence now guarding that area.  It is energised to 8000 volts which is very painful but safe to touch. We have posted a warning notice close to where they appear to access the embankment from the road.

There is a long standing informal agreement we allow the neighbouring farmer access through to his field by the track next to the riverbank. He'd lost the key we'd given him for the road gate padlock, but we gave him another last week so he could get to his sheep. Yesterday we found he'd been through with a heavy tractor which was not too unreasonable, but unfortunately the weight of the machine has damaged the soft riverbank when he manoeuvred too close to the edge. We'll need to drive some wooden piles into the bank to reinforce it and prevent further damage. In the longer term we will grow some willow spilings in that part of the bank to provide strengthening.

Saturday, 6 February 2016

Timber! Felling some trees in the Orchard

We had a break in the weather and were able to start the process of managing the woodland at the side of the Turnditch Orchard Project. We don't want to clear fell the woodland on the embankment as this might risk a collapse. We've decided to create groves of open areas where the larger tree are cut down to their base to encourage coppice re-growth of the Ash trees. In a few years the areas we've clear will regrow around the stumps. Meanwhile we'll also clear the undergrowth and overcrowding by small thorn bushes. 

The volunteers took away two lard trailer loads of Ash logs to be seasoned for their log burning stoves. However the soft muddy state of the ground after the winter rains gave the driver of the 4x4 some problems in pulling the heavy trailer. We now have some deep tyre ruts in the orchard. No doubt those will disappear over the next couple of years.

Tuesday, 2 February 2016

Home From Home Dog Training Derbyshire

We are intending to use the orchard site to train our dogs, a pair of German Shepherd Dogs once the riverside fencing is complete. We also go to formal obedience training with the dogs at a local company based in Hulland Village which is between Ashbourne and Belper. The company is called Home From Home Dog Training. People from Turnditch, Bakewell, Ripley, Matlock, Wirksworth, Youlgreave, Melbourne also attend the classes.

Sunday, 24 January 2016

Building a temporary stile in the Orchard

In a couple of days time volunteers arrive on the orchard to start the process of culling trees on the embankment at the edge of our orchard field. I agreed to this work about a week ago, but in the intervening period I had to quickly erect some wire stock fencing across the width of the orchard to ensure the neighbouring sheep don't invade our land and damage the fruit trees. Unfortunately the new stock fence bars the way to the trees on the embankment and the volunteers would be faced with constantly having to climb over the stock fence, most likely damaging it in the process.

Today I spent a few hours building a stile over the stock fence to allow people to climb over safely and without damaging the wire fence. I utilised four round fence posts each about six foot (1,95 metres) tall to form the two sides of a ladder over the wire fence. I cut some robust half round 3 inch wooden fence railing into 60 cm (2 ft) sections to form ladder rungs. It is crudely constructed, using a chain saw, a spanner (wrench) and a hammer with coach bolts and fencing wire holding it all together. However it is a robust construction and should do the job. It weighs around 100 kg (220 lbs), carrying the wood and the tools to the far end of the orchard burnt off loads of calories.

Let's hope people find it useful!

Thursday, 21 January 2016

Sheep Alert at the Orchard

We were driving back from shopping in Ashbourne and travelled past the orchard site. We noticed that sheep had appeared in the adjoining field. I had to rush back and perform some urgent fencing work to strengthen the weaker parts of the hedge between the fields. At the moment the electric fence is out of commission and there is a risk that sheep could stray into the orchard and damage the young trees. In theory the owner of the sheep has the responsibility to provide fencing ensure his animals don't stray on to our land, but he doesn't have a great history in that respect.

This afternoon I drove ten fence posts into the ground and installed about sixty feet (18 Metres) of wire stock fence.


Update 6th Feb 2016: So far no sheep on the orchard. My efforts paid off.